Do You Need a Permit for Solar Panels in Illinois? What Chicago, Aurora, Rockford and Peoria Require in 2026
Yes, you need a permit to put solar panels on a house in Illinois. Every city I checked requires one, usually a building permit plus an electrical permit, and your installer normally pulls both. Rockford says it turns residential rooftop solar permits around in three business days or less. Chicago runs systems of 13.44 kW or less through its Express Permit Program. And the permit isn't optional paperwork: under the state interconnection rule, Ameren or ComEd's sign-off depends on the local electrical inspector approving the work first.
Here's what four Illinois cities put in writing, what it costs, and where projects actually get stuck.

The key facts
| City or rule | What it requires | Fee and timing in writing | Source |
|---|---|---|---|
| Chicago | Express Permit Program for rooftop systems with inverter output of 13.44 kW or less; drawings by an Illinois-licensed architect or structural engineer; licensed general and electrical contractors | No turnaround time or fee amount posted on the solar page | City of Chicago, Express Permit Program, Small-Scale Solar PV (accessed Nov. 2026) |
| Aurora | Solar building permit application; stamped electrical and structural drawings; third-party inspection report | $77 application fee; estimated 5 business days initial review | City of Aurora solar application and timeframes handout (2026) |
| Rockford | Building permit plus electrical permit, filed online; two inspections | 0.55% of project value + $50 + $50, plus 10% technology fee; 3 business days or less | City of Rockford Solar Permitting page and checklist (accessed Nov. 2026) |
| Peoria | Residential Solar Permit plus electrical permit; electrician licensed with the city | 0.8% of construction cost (schedule effective 9/23/2020) + $100 fire solar permit fee | City of Peoria fee schedule; solar application rev. 04/25/2023 |
| Illinois interconnection rule | Local electric code official approval and a certificate of completion before the utility clears the system | $200 standardized Level 1 interconnection cost | 83 Ill. Adm. Code 466.90 and Appendix B |
Why the permit matters more here than you'd think
Most people treat the permit as a formality. In Illinois it's wired into the part you care about, which is getting the system turned on and earning credits.
The state's interconnection rule (83 Ill. Adm. Code Part 466) covers how Ameren Illinois and ComEd connect home solar. For the expedited Level 1 review that small systems use (an export capacity of 25 kW or less), the utility's agreement to interconnect is conditioned on two things I'd underline. First, the system "has been approved by local or municipal electric code officials with jurisdiction over the interconnection." Second, a certificate of completion "has been returned" to the utility.
That certificate has a signature line on it. By signing, the customer states that the system "has been approved by the local electric inspector having jurisdiction" and that a signed copy of the inspector's approval is attached. The form also says you won't operate the system until the utility gives final approval.
That chain is the reason a system with no city inspection doesn't get permission to operate, and a system that isn't allowed to run isn't producing power or earning net metering credits. I walked through the utility side of that in how long until your solar gets turned on.
Chicago: the Express Permit Program
Chicago handles most home solar through its Express Permit Program, an online path the city describes as "a streamlined way to obtain a permit for installation or replacement of a small rooftop solar photovoltaic (PV) system, with or without an associated energy storage system."
The limits that matter:
- Size: inverter output of 13.44 kW or less. Bigger systems aren't eligible for this path.
- Batteries: up to 20 kWh of storage tied to the solar system (10 kWh for non-lithium-ion batteries).
- Roof only: the permit doesn't cover wall-mounted or ground-mounted equipment.
- Setbacks: panels can't sit within 3 feet of the roof edge on a residential building.
- Height: roofs with an average height over 40 feet aren't eligible.
- Ballasted racks: a weighted-down system on a roof averaging over 15 feet isn't eligible either, which can catch flat-roofed two-flats and three-flats. More in solar panels on a flat roof in Illinois.
Chicago also asks for more professional sign-off than most towns. New installations need drawings and calculations from an Illinois-licensed architect or structural engineer, and that person (or someone working under them) has to inspect the property in person before the application goes in, checking the roof structure and the existing electrical system. Every application needs a licensed general contractor and a licensed electrical contractor. The city's page also states that an Illinois Commerce Commission Distributed Generation Installer Certification "is required to install a solar photovoltaic system."
One detail I like: the city tells you to look at your roof first. "In most cases, you won't want to install new solar panels on a roof that will need significant repair or replacement within a few years." I agree, and it's the same advice in my post on whether you need a new roof before solar. If you do re-roof later, Chicago lets a permitted system come off and go back in the same layout without new architect drawings.
Live in a condo? Chicago wants a letter from the association approving the work. That's separate from any HOA rule, which I covered in the Illinois HOA solar law.
I'm not quoting a Chicago fee. The solar page points to the city's stand-alone permit fee ordinance and doesn't post a dollar amount, and I won't guess at one.
Aurora: stamped drawings and a third-party report
Aurora has a dedicated solar application covering rooftop and on-grade systems. Its 2026 timeframes handout lists a $77 application fee for residential solar and an estimated 5 business days for initial review, with 5 more for a revision. The city notes those are estimates that depend on workload.
Aurora's submittal list is the longest of the four. It asks for construction drawings "stamped and signed" by a licensed design professional for both electrical and structural work, one-line diagrams, manufacturer cut sheets, photos of every side of the building showing fire access points, and an "analysis of existing roof to include age, materials and structural loading." The checklist asks whether the equipment pushes the roof load past 10 pounds per square foot on a house.
It also requires something I don't see everywhere: a third-party inspection report on the finished installation, delivered before final inspection approval, from an Illinois-licensed architect or structural engineer, a NABCEP Certified Inspector or an ICC E2 inspector. General and electrical contractors have to be licensed and registered with Aurora before the permit is issued.
The $77 is the application fee, due when the application goes in. For the rest, Aurora's solar page points to the city's permit fee schedule and says to ask the Building and Permit division "about an estimated fee calculation" for your project.
Rockford: three business days, and the fee formula in writing
Rockford is the most upfront of the group. Its solar page says: "The City of Rockford processes all residential rooftop solar PV permits in three business days or less once all required information is submitted."
You need two permits, a building permit and an electrical permit, both filed online. The city's checklist says the electrical application is completed by a licensed City of Rockford electrical contractor, and it asks for an electrical diagram, a structural worksheet with load calculations, and a plat view of the site.
Rockford also publishes its residential solar fee formula:
- 0.55% of the project's value
- plus a $50 processing fee
- plus a $50 electrical permit fee
- plus a 10% technology fee on that total
On an 8 kW system at about $2.60 per watt, the average cash price I see, that's a $20,800 project and an estimated $236 in permit fees by my math, reading the technology fee as 10% added to the other three lines. Your number moves with your system's price.
After the install, Rockford requires two inspections on a house, a final structural and a final electrical, and its policy is to complete a solar inspection within five business days of the request.
Peoria: a solar permit, an electrical permit and a fire fee
Peoria asks for a Residential Solar Permit and an electrical permit, and "the electrician must be licensed with the City of Peoria." A complete application includes a professionally designed roof plan with load calculations, a site plan, a construction plan, an electrical plan and a location plan.
Peoria's residential fee schedule, effective Sept. 23, 2020, charges the construction cost times 0.008 on jobs of $5,000 or more, with the cost rounded up to the next $1,000. The solar application adds a $100 Fire Solar Voltaic Permit Fee. On the same $20,800 system, that's $21,000 × 0.008 = $168, plus $100, or an estimated $268 before the separate electrical permit.
The same fee schedule carries a warning worth knowing: "Work started without a permit will now result in a triple-charge of the permit fee."
Peoria's page also says what I tell homeowners. "A qualified solar installer is familiar with this process and should be able to help a property owner apply for a permit, or, should be able to submit the required permits on the owner's behalf."
Who pulls the permit, and who pays?
Your installer should. Every one of these cities ties the electrical side to a contractor licensed or registered in that town, and most want engineered drawings. Peoria's building page does say a homeowner who owns and occupies the house may do their own work, and the state's certificate of completion has an "owner-installed" checkbox, so doing it yourself isn't impossible everywhere. But this isn't a form a homeowner fills out on a lunch break.
On cost, the permit is a small line on a solar project. A few hundred dollars on a system that runs about $20,800 is roughly 1%. With a full-service installer, permitting is normally part of the job, whether you pay cash or go with a $0-down lease. What I'd do is ask one question before signing: "Are permit and inspection fees included in this price?" The answer should be yes, in writing. My post on how to compare solar quotes lists the other lines to check.
Where permits actually slow a project down
The review itself is rarely the problem. Three business days in Rockford and an estimated five in Aurora aren't what turn a six-week project into a four-month one. In my experience, the delays come from:
- Incomplete applications. Missing load calculations or an unstamped drawing sends the file back to the start of the line.
- Roof questions. Aurora asks for the roof's age and structure up front. Chicago can require a professional condition evaluation if the roof looks worn. If the mounting holes are what worry you, I went through that in do solar panels cause roof leaks.
- Electrical surprises. Chicago requires existing electrical deficiencies to be corrected before any solar equipment is connected. An undersized or outdated service can add a step, which I covered in whether you need a panel upgrade for solar.
- The handoff after inspection. The inspector's approval has to reach the utility with the certificate of completion. Under the state rule, the utility has 7 business days to say whether a Level 1 request is complete and 15 business days after that to run its screens.
Smaller towns and unincorporated areas
I picked these four cities because they publish their solar rules clearly. Your town may use different forms, fees and code editions. Belleville, for example, says any improvement to private property in the city limits needs the appropriate permits and that fees vary with the size and scope of the project.
If you live outside city limits, the county building or zoning office is usually the place to start. And if your power comes from a municipal utility or a co-op rather than Ameren or ComEd, the hookup rules are different too. See solar on an Illinois co-op or city utility.
My bottom line
You need the permit, your installer should pull it, and it shouldn't cost you more than a few hundred dollars or a few days in most towns. What you're really checking is whether the company you hire handles it without drama. Ask who pulls the permit, whether the fees are in the price, and who sends the inspector's sign-off to the utility.
Want to see what a system could do before anyone files anything? Check my roof uses satellite data, and the savings calculator estimates what solar could do against your Ameren or ComEd bill. If you'd like a lease, a cash price and a Solar for All check side by side, see how our solar lease works.
Sources
- City of Chicago, Express Permit Program: Small-Scale Solar Photovoltaic (PV) System (accessed Nov. 10, 2026)
- City of Chicago, Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (accessed Nov. 10, 2026)
- City of Aurora, Solar Application, Residential and Commercial (2026 application update)
- City of Aurora, Submittal Requirements, Application Timeframes and Inspection Contacts (2026)
- City of Aurora, Solar In Aurora: Solar Permit Requirements (accessed Nov. 10, 2026)
- City of Rockford, Solar Permitting (accessed Nov. 10, 2026)
- City of Rockford, Solar Permitting Check List, including residential permit fee formula (accessed Nov. 10, 2026)
- City of Rockford, Solar Installation Inspection (accessed Nov. 10, 2026)
- City of Peoria, Building Safety: Solar Permit Applications & Information (accessed Nov. 10, 2026)
- City of Peoria, Permit Fee Schedule (effective Sept. 23, 2020)
- City of Peoria, Application for Residential Solar Voltaic Building Permit (rev. 04/25/2023)
- City of Belleville, Health, Housing & Building (accessed Nov. 10, 2026)
- 83 Ill. Adm. Code 466.90, Level 1 Expedited Review (last amended effective May 26, 2022; Cornell LII copy)
- 83 Ill. Adm. Code 466, Appendix B, Certificate of Completion (Cornell LII copy)
- 83 Ill. Adm. Code 466.80, Determining the Review Level (Cornell LII copy)
Wondering what your town will ask for? Call me at (618) 217-2001 or reach out here and I'll tell you what the permit and timeline look like where you live.